July 12, 2010
Deepwater Horizon Update
Here is a link to a video of the spool piece being installed. At about 8 seconds in there is a quick cut. At that point you can see the spool piece beginning to enter the top of the BOP stack. There is no visible oil emerging. The Helix is connected to the choke line. The end of the leaking oil may be nigh!